Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/sites/quebecnickel/wp-includes/functions.php on line 6114
May 16, 2022 - Québec Nickel

Québec Nickel Corp. Intersects 0.44% Ni, 0.51% Cu and 0.69 g/t Pt-Pd-Au Over 18.50 Metres at its Ducros Project, Abitibi Québec

Québec Nickel Corp. Intersects 0.44% Ni, 0.51% Cu and 0.69 g/t Pt-Pd-Au Over 18.50 Metres at its Ducros Project, Abitibi Québec Continuity drilling of the Fortin Sill Ni-Cu-PGE-Au zone initiated Vancouver, British Columbia, May 16, 2022 – Québec Nickel Corp. (CSE: QNI; FSE: 7lB; OTCQB: QNICF) (or the “Company“) is pleased to report nickel-copper-PGE-gold drilling […]